Project Summary
Project Name: Kuwait MEW’s Nuwaiseeb Power and Water Project – Phase I
Facility Type: Power & Desalination Plant
Client: Kuwait Ministry of Electricity and Water (MEW)
Budget (US $): Unknown
Project Initiation: Not Given
Project Completion:: Sep 08, 2025
Status: PMC Awarded,
Location: Nuwaiseeb
Project Current Status

The bids submission deadline has been extended to 1 November, 2022 for the overhead transmission line contract for phase I of an integrated power and water plant in Nuwaiseeb. (October 2022)

Project History
  • Kuwait Ministry of Electricity and Water (MEW) is set issue tender for the design consultancy package for the phase 1 of the planned Nuwaiseeb power and water desalination plant in Ahmadi by October 2020. The pre-qualification and tendering process for the EPC contract for Phase 1 is expected to start in March 2021. (September 2020)
  • The MEW has invited bids by 26 September, 2021 for the consultancy contract for the phase I of an integrated water and power plant in Nuwaiseeb. The project is expected to be procured as an EPC contract. The Phase I scope involves the construction of a 3,600 MW combined-cycle gas turbine power plant and water desalination capacity of 75 million imperial gallons per day. (September 2021)
  • The client has extended the bids submission deadline to 23 November, 2021 for the consultancy contract for the phase I of an integrated water and power plant in Nuwaiseeb. The consultancy firm will carry out studies, design, and preparation of tender documents for the power plant. (November 2021)
  • Kuwait’s MEW has extended the bids submission deadline to 28 November, 2021 for the overhead transmission line contract for phase I of an integrated water and power plant in Nuwaiseeb. The contract scope involves supplying and installing a 400 kV overhead line from the Nuwaiseeb power station to the Al-Mutlaa substation. (November 2021)
  • Kuwait’s MEW has yet again extended the bids submission deadline to 21 December, 2021 for the consultancy contract for phase I of an integrated water and power plant in Nuwaiseeb. The consultancy firm will carry out studies, design, and preparation of tender documents for the power plant. (December 2021)
  • Kuwait’s MEW has extended the bids submission deadline to 2 January, 2022 for the overhead transmission line contract for phase I of an integrated water and power plant in Nuwaiseeb. The contract scope involves supplying and installing a 400 kV overhead line from the Nuwaiseeb power station to the Al-Mutlaa substation. (January 2022)
  • The bids submission deadline has been extended to 1 February, 2022 for the overhead transmission line contract for phase I of an integrated power and water plant in Nuwaiseeb. (January 2022)
  • The bids submission deadline for the consultancy contract for phase I of an integrated water and power plant in Nuwaiseeb has been extended to 15 March, 2022. The consultancy firm will carry out studies, design, and preparation of tender documents for the power plant. (February 2022)
  • Bids submission deadline has been extended to 8 March, 2022 for the overhead transmission line contract for phase I of an integrated power and water plant in Nuwaiseeb. (February 2022)
  • Kuwaiti MEW has extended the bids submission deadline to 3 April, 2022 for the consultancy contract for phase I of an integrated water and power plant in Nuwaiseeb. The consultancy firm will carry out studies, design, and preparation of tender documents for the power plant. The project is expected to be procured as an engineering, procurement and construction (EPC) contract. The Phase 1 scope involves the construction of a 3,600 MW combined-cycle gas turbine power plant and water desalination capacity of 75 million imperial gallons per day. (March 2022)
  • Bids submission deadline for the overhead transmission line contract for phase I of an integrated power and water plant in Nuwaiseeb has been extended to 10 April, 2022. (March 2022)
  • The bids submission deadline has been extended to 22 May, 2022 for the overhead transmission line contract for phase I of an integrated power and water plant in Nuwaiseeb. (May 2022)
  • Kuwaiti MEW has received bids for the consultancy contract for phase I of an integrated water and power plant in Nuwaiseeb. The only bidder whose bid has been accepted is Fichtner GmbH & Co. KG. The consultancy firm will carry out studies, design, and preparation of tender documents for the power plant. (May 2022)
  • The bids submission deadline has been extended to 29 May, 2022 for the overhead transmission line contract for phase I of an integrated power and water plant in Nuwaiseeb. (May 2022)
  • The bids submission deadline has been extended to 19 June, 2022 for the overhead transmission line contract for phase I of an integrated power and water plant in Nuwaiseeb. (June 2022)
  • The bids submission deadline has been extended to 2 August, 2022 for the overhead transmission line contract for phase I of an integrated power and water plant in Nuwaiseeb. (July 2022)
  • The bids submission deadline has been extended to 4 September, 2022 for the overhead transmission line contract for phase I of an integrated power and water plant in Nuwaiseeb. (July 2022)
  • The bids submission deadline has been extended to 18 October, 2022 for the overhead transmission line contract for phase I of an integrated power and water plant in Nuwaiseeb. (October 2022)
Project Contract Awards - Feed
Contractor Prequalified Contractor Bids Submitted Contractor Awarded | Contract Value
Project Contract Awards - PMC
Contractor Prequalified Contractor Bids Submitted Contractor Awarded | Contract Value
  • Fichtner GmbH & Co. KG
  • Fichtner GmbH & Co. KG
Project Contract Awards - EPC
Contractor Prequalified Contractor Bids Submitted Contractor Awarded | Contract Value
  • Not yet appointed
Related Projects
No Related Projects
Project Schedule

September 2021: Invitation to Bid for Consultancy Contract for Phase I

Q3, 2025: Expected Commissioning & start-up 

Project Scope

The project scope involves the development of an integrated water and power plant in Nuwaiseeb. in Kuwait.

 

The project will be implemented in two phases.

 

The Phase 1 scope involves the construction of a 3,600-megawatt combined-cycle gas turbine power plant and water desalination capacity of 75 million imperial gallons per day.

 

The plant will run on low sulphur fuel oil (LSFO). The scope involves the construction of a powerhouse, a substation and other facilities, the installation of gas turbines, steam turbines, condensers, boilers/heat exchangers and electric generators, and the laying of transmission lines.

Project Structure:
The project is owned, operated and managed by Kuwait Ministry of Electricity and Water (MEW).
Ministry of Electricity and Water (MEW) Kuwait
Address:

Ministry of Electricity and Water
South Al Sourra Street
Ministries Area
P.O. Box 12
Kuwait City Safat 13001 

Phone: +965 2537-1000
Fax: +965 2537-1420