Project Summary | |
---|---|
Project Name: | FPC’s Fujairah F3 Independent Power Project (IPP) |
Facility Type: | Power Plant |
Client: | Fujairah Power Company F3 |
Budget (US $): | 3,000,000,000 |
Project Initiation: | Apr 05, 2016 |
Project Completion:: | Jun 05, 2023 |
Status: | EPC Awarded, |
Location: | Fujairah |
Project Current Status |
---|
Netherlands-headquartered Mammoet has successfully delivered and installed gas turbines on the foundations of the Fujairah F3 power project. Mammoet was awarded the contract for the receiving, transport, lifting and installation scope of power plant components, including the three largest-capacity and most efficient gas turbines in the UAE, by Samsung C&T Corporation, the EPC contractor for the project. Three gas turbines, each weighing 528 tonnes and measuring 13.6 metre long, 6.1 metre wide and 6 metre high, and three gas turbine generators, each weighing up to 395 tonnes and measuring 11 metres long, 5.8 metres wide and 5.2 metres high, were delivered to the site. Mammoet used its 1,250 tonnes and two 400 tonnes crawler cranes to install other components, including 45 modules for a Heat Recovery Steam Generator (HRSG). (November 2022) |
Project History |
---|
|
Project Contract Awards - Feed | ||
---|---|---|
Contractor Prequalified | Contractor Bids Submitted | Contractor Awarded | Contract Value |
|
|
|
Project Contract Awards - PMC | ||
---|---|---|
Contractor Prequalified | Contractor Bids Submitted | Contractor Awarded | Contract Value |
|
|
|
Project Contract Awards - EPC | ||
---|---|---|
Contractor Prequalified | Contractor Bids Submitted | Contractor Awarded | Contract Value |
|
|
|
Related Projects |
---|
No Related Projects |
Project Schedule |
---|
April 2016: Project Initiation November 2018: Proposals submitted for advisory consultancy roles March 2019: Prequalification Entries Submitted for EPC May 2019: Invitation to bid for EPC October 2019: Bid Submission EPC February 2020: Development partner contract awarded February 2020: EPC contract awarded Q2, 2022: Procurement of early power from the plant Q2, 2023: Expected commencement of full power generation |
Project Scope |
---|
The project scope involves the development of F3 independent power project (IPP) in the northern emirates of Fujairah.
The combined-cycle gas turbine (CCGT) power plant will have a generation capacity of 2,400 MW and will be located at the Fujairah power and water complex, 302 km north of the UAE capital. The plant will be structured as a stand-alone independent power project.
The project developer will own up to 40 percent of the special purpose vehicle (SPV), while the remaining equity will be held directly or indirectly by the EWEC.
The F2 IWPP, next to F3, has a power generation capacity of 2,000MW and a desalination component of 130 million imperial gallons a day (MIGD). It was commissioned in 2011.
In 2013, the desalination component of the existing 100MIGD Fujairah 1 (F1) IWPP project was expanded by 30 MIGD. |
Project Structure: |
The project is owned and operated by Fujairah Power Company F3, a special purpose company jointly owned by Abu Dhabi National Energy Company (TAQA), Mubadala Investment Company, Marubeni Corporation and Hokuriku Electric Power Company. |
LarryOpalka | |
---|---|
Address: | Abu Dhabi Water & Electricity Authority .ADWEA. PO Box 6120, Abu Dhabi. |
Designation: | Vice President - Engineering |
Department: | ADWEA |
Phone: | +97 12 721500 |