Project Summary
Project Name: KOC’s Crude Oil Gathering Centre - 32
Facility Type: Oil
Client: Kuwait Oil Company (KOC)
Budget (US $): 2,000,000,000
Project Initiation: Not Given
Project Completion:: Mar 03, 2020
Status: EPC Awarded,
Location: Burgan
Project Current Status

Petrofac is building GC-32 at Burgan. Work on GC-32 was supposed to end in mid-2020, but is facing delays. The GC-32 project is the first sour crude gathering center and will 120,000 b/d process crude and associated gas from the Arifjan, Marat, Minagish Oolite and Burgan Wara high hydrogen sulphide fields. (September 2021)

Project History
  • Amec Foster Wheeler of UK has completed the FEED study for the project. (December 2014)
  • KOC is likely to invite bids for the gathering centre contract in the middle of 2016. (August 2015)
  • KOC prepares tender for the gathering centre; it is likely to be issued in Q1 2016. (December 2015)
  • KOC has invited bids firms to submit bids for the project by 1 November, 2016. The companies invited are - Daelim Industrial Company of South Korea, GS Engineering & Construction of South Korea, JGC Corporation of Japan, Petrofac of UK, Saipem of Italy, Samsung Engineering of South Korea , SK Engineering & Construction Company of South Korea, and Tecnicas Reunidas of Spain. (July 2016)
  • The bids submission deadline for a contract to build a gathering centre – GC 32, has been extended to 20 December, 2016. (November 2016)
  • Bids have been submitted for the contract to build a gathering centre – GC 32. Petrofac of UK has submitted the lowest bid of KD 408 million ($1.33 billion). (January 2017)
  • EPC contract worth KD 408 million ($1.33 billion) to build a gathering centre – GC 32 has been awarded to Petrofac of UK. (March 2017)
  • A contract for the supply of compressor trains for GC-32 project has been awarded to MAN Diesel & Turbo of Germany. The contract scope covers supply of nine electric motor-driven compressors, type RB35 and RB28, which will allow extremely challenging sour and wet gas from the Burgan field to be compressed. The order also includes an option for additional machines and services. (November 2017)
  • KOC has invited bids by 29 March for the rerouting of flowlines and associated works for Gathering Centre – GC 32 at SEK area. (March 2021)
Project Contract Awards - Feed
Contractor Prequalified Contractor Bids Submitted Contractor Awarded | Contract Value
Project Contract Awards - PMC
Contractor Prequalified Contractor Bids Submitted Contractor Awarded | Contract Value
  • No Tendering Process
Project Contract Awards - EPC
Contractor Prequalified Contractor Bids Submitted Contractor Awarded | Contract Value
  • Air Liquide
  • Aker Kvaerner ASA
  • China Petrochemical Engineering Construction Company
  • Chiyoda
  • Daewoo Engineering & Construction Co.
  • Dodsal
  • Hyundai Heavy Industries
  • Consolidated Contractors Company .CCC.
  • South Korea's GS Engineering & Construction Corp
  • Daelim Industrial Co
  • Tecnicas Reunidas
  • JGC Corporation of Japan
  • Larsen & Toubro
  • Petrofac
  • Saipem
  • Samsung Engineering
  • SK Engineering Company .SKEC.
  • SNC Lavalin
  • KBR
  • Daelim Industrial Co
  • JGC Corporation of Japan
  • Petrofac
  • Saipem
  • Samsung Engineering
  • SK Engineering Company .SKEC.
  • South Korea's GS Engineering & Construction Corp
  • Tecnicas Reunidas
  • Petrofac($1.33 billion)
Related Projects
No Related Projects
Project Schedule

July 2016: Invitation to Bid for EPC

December 2016: Bids Submission EPC

March 2017: Contract Awarded EPC

Q1 2020: Expected start-up and commissioning

 

Project Scope

The project scope involves the construction of 150,000 bpd crude oil gathering centre - 32, near Kuwait’s Burgan oil field. It will also include a booster station modification.

 

The GC will process crude oil and associated gas produced from the Arifjan, Marat, Minagish, Oolite and Burgan Wara fields.

 

The facilities to be constructed will have the following product capabilities:
• Total crude oil production - 120,000 barrels per day (bpd)
• Crude oil desalting - 120,000 bpd
• Total condensate production - 12,500 bpd of condensate
• Total effluent water - 280,000 bpd of water
• Total gas production - 83 million cubic feet a day of gas 

 

Kuwait’s oil fields are currently connected to 26 gathering centres, serving as a collection location for crude produced at several wells and providing initial treatment through the separation of associated gas and removing salt.

Project Structure:
The project is owned, operated and managed by Kuwait Oil Company (KOC).
Abdullatif H.Al Tourah
Address:

Kuwait Oil Company (KOC)

P.O. Box 9758,

Ahmadi 61008, Kuwait.

Designation: Executive Management
Department: Kuwait Oil Company
Phone: +965 2398 9111
Fax: +965 2398 3661
Email: kocinfo@kockw.com
AnfalAl Shalan
Address:

Kuwait Oil Company 

P.O. Box 9758,

Ahmadi 61008,

Kuwait

Designation: Chief Admin Officer
Department: Kuwait Oil Company
Phone: +965 2386 4720
Fax: +965 2398 0791
Email: aashalan@kockw.com
MazenAl Sardi
Address:

Kuwait Oil Company,

P.O. Box 9758,

Ahmadi 61008,

Kuwait.

Designation: Project Manager
Department: Kuwait Oil Company
Phone: +965 2398 5085
PrathapKumar
Address:

Petrofac

Eastern Plaza Building (ground floor)

Block 8, Plot No. 42

Ahmadi Industrial Area

PO Box 9816

Ahmadi - 61009

Kuwait

Designation: Project Manager
Department: Petrofac Limited
Phone: +965 2228 1405
Fax: +965 2228 1409
Email: epc@petrofac.com