Project Summary
Project Name: Saudi Aramco’s Marjan Cogeneration ISPP
Facility Type: Steam and power plant
Client: Saudi Aramco
Budget (US $): Unknown
Project Initiation: Not Given
Project Completion:: Mar 31, 2023
Status: EPC Awarded,
Location: Marjan
Project Current Status

A contract to engineer, procure and construct a 380 kV substation project to connect Tanajib cogeneration and desalination project to the Saudi electricity grid has been awarded to Linxon. The Linxon supply consists of an EPC contract for the 380 kV GIS substation with all necessary protection and control systems. Linxon will be executing this on a turnkey basis including associated construction activities, equipment installation and commissioning. (December 2021)

Project History
  • Aramco has invited the pre-qualified companies to submit bids by 29 July, 2019 for its planned Marjan cogeneration independent steam and power plant (ISPP), which will be co-developed with the Tanajib desalination project. (March 2019)
  • Bids submission deadline bids for the planned Marjan cogeneration ISPP has been extended to 9 September, 2019, from the previous submission date of 29 July, 2019. (July 2019)
  • The bids submission deadline has been extended to 30 September, 2019 for the planned Marjan cogeneration ISPP, which will be co-developed with the Tanajib desalination project. (September 2019)
  • 4 groups have submitted bids for the planned Marjan cogeneration ISPP – Acwa Power of Saudi Arabia / Gulf Investment Corporation (GIC) of Kuwait, Engie of France, Kepco of South Korea / Al-Jumaih of Saudi Arabia, Marubeni of Japan. (October 2019)
  • Bidding groups for the planned Marjan cogeneration ISPP, have been invited for clarifications meetings in November. (October 2019)
  • Clarification meetings are being conducted with four bidding groups for the Marjan cogeneration ISPP and Tanajib desalination plant. (November 2019)
  • The consortium of Marubeni of Japan and Abu Dhabi National Energy Company (TAQA) is emerged as the frontrunner to win the development contract for the planned Marjan cogeneration independent steam and power plant (ISPP), which will be co-developed with the Tanajib desalination project. (December 2019)
  • The consortium of Marubeni of Japan and Abu Dhabi National Energy Company (TAQA) has received a conditional letter of award for the planned Marjan cogeneration ISPP. (March 2020)
  • Negotiations on the ISPP package are proceeding between Saudi Aramco and a team of Marubeni and TAQA. (June 2020)
  • For the planned Marjan cogeneration ISPP, which will be co-developed with the Tanajib desalination project, the consortium of Marubeni of Japan and Abu Dhabi National Energy Company (TAQA) is set to be signed up for the development contract this month. (September 2021)
  • For the Tanajib power/steam and desalination plant, the consortium of Marubeni of Japan and Abu Dhabi National Energy Company (TAQA) have signed the final contracts and reached financial close to develop the project. The consortium will also develop supporting infrastructure, including pipelines, to connect the desalination and cogeneration plants to end users. It will operate and maintain the plants for a period of 20 years. The project will have a power capacity of 940 MW and a steam capacity of 1,084 tonnes per hour of steam. The desalination plant will have a capacity of 5.25 million imperial gallons a day (MIGD). (November 2021)
Project Contract Awards - Feed
Contractor Prequalified Contractor Bids Submitted Contractor Awarded | Contract Value
Project Contract Awards - PMC
Contractor Prequalified Contractor Bids Submitted Contractor Awarded | Contract Value
  • Fichtner Consulting Engineers of Germany
  • Fichtner Consulting Engineers of Germany
  • Fichtner Consulting Engineers of Germany
Project Contract Awards - EPC
Contractor Prequalified Contractor Bids Submitted Contractor Awarded | Contract Value
  • ENGIE Group
  • ACWA Power / Gulf Investment Corporation (GIC)
  • Kepco of South Korea / Al-Jumaih of Saudi Arabia
  • Marubeni of Japan / Abu Dhabi National Energy Company (TAQA)
  • ACWA Power / Gulf Investment Corporation (GIC)
  • ENGIE Group
  • Kepco of South Korea / Al-Jumaih of Saudi Arabia
  • Marubeni of Japan / Abu Dhabi National Energy Company (TAQA)
  • Marubeni of Japan / Abu Dhabi National Energy Company (TAQA)
Related Projects
Saudi Aramco’s Marjan Oilfield Development Project
Saudi Aramco’s Marjan Gas Oil Separation Plant (GOSP) Project
Project Schedule

March 2019: Invitation to Bid for EPC

October 2019: Bid submission EPC

March 2020: Bidder named for conditional award

November 2021: Contract signed for EPC

March 2023: Expected start-up and commissioning

Project Scope

The project scope involves the construction of a cogeneration independent steam and power plant (ISPP), which will be co-developed with the Tanajib desalination project.

 

The ISPP is planned to have a power capacity of 700-900 MW, with a steam capacity of 1,152-3,054 kilo pounds an hour, and a desalination component of 24,000 cubic metres / day (cm/d), expandable to 34,000 cm/d by 2030.

 

Sumitomo Mitsui Banking Corporation (SMBC) of Japan is the financial adviser, and Fichtner Consulting Engineers of Germany is the project consultant.

Project Structure:
The project is owned, operated and managed by Saudi Aramco.
MajedAl Mugla
Address: Saeed Tower, Dammam Khobar Highway, P.O. Box 151, Al Khobar 31952, Saudi Arabia, Al Sharqiyah
Designation: Vice President, Project Management
Department: Saudi Aramco
Phone: +966 3-872-0115
MohammadAl Onaizi
Designation: Communications Manager
Department: Project Control Department, Saudi Aramco
Phone: +966 3 862 1142
Fax: +966 3 873 8190