Bid & Tender
Project Summary
Project Name: AD Ports’ Khalifa Port Gas Terminal Hubs
Facility Type: LNG / LPG Terminal
Client: AD Ports Group of UAE
Budget (US $): 8,000,000,000
Project Initiation: Not Given
Project Completion:: Dec 12, 2033
Location: Abu Dhabi
Project Current Status

AD Ports Group and UAE-based Nimex Terminals, on February 24, marked the groundbreaking of the UAE’s first private-sector LPG terminal hub at Khalifa Port. In parallel with the LNG terminal hub development, the LPG terminal hub is being developed to accommodate large, long-haul gas carriers and will deliver large?scale refrigerated storage and marine handling infrastructure for propane, butane, and LPG mix products. (February 2026)

Project History
  • AD Ports Group has signed contracts with Nimex Terminals for the development of the UAE’s first private-sector Liquefied Natural Gas (LNG) and Liquefied Petroleum Gas (LPG) terminal hubs that can accommodate large, long-haul gas carriers at Khalifa Port. The contracts, based on the projected 50-year multiple revenue streams from the two terminal hubs, is valued at over AED 30 billion ($8 billion). Initial operations are expected to commence by mid-2028, with steady-state operations projected to be achieved by 2031 for the LNG terminal, and by 2033 for the LPG terminal. (November 2025)
  • The Nimex Terminals Ltd. (NTL) has awarded a contract to Bilfinger Middle East to provide comprehensive engineering services for the development of the UAE’s first Liquefied Petroleum Gas (LPG) terminal hub at Khalifa Port in Abu Dhabi. The contract scope will include Concept and Front-End Engineering Design (FEED), Preliminary Design Permitting Services and EPC Tender Package. (December 2025)
Project Contract Awards - Feed
Contractor Prequalified Contractor Bids Submitted Contractor Awarded | Contract Value
Project Contract Awards - PMC
Contractor Prequalified Contractor Bids Submitted Contractor Awarded | Contract Value
  • No Tendering Process
Project Contract Awards - EPC
Contractor Prequalified Contractor Bids Submitted Contractor Awarded | Contract Value
  • Bilfinger Middle East
  • Bilfinger Middle East
  • Bilfinger Middle East
Related Projects
No Related Projects
Project Schedule

November 2025: Development Agreement Signed

December 2025: Contract Awarded for FEED and EPC

December 2031: Start-up and commissioning of LNG terminal

December 2033: Start-up and commissioning of LPG terminal

Project Scope

The project scope involves the development of the UAE’s first private-sector Liquefied Natural Gas (LNG) and Liquefied Petroleum Gas (LPG) terminal hubs that can accommodate large, long-haul gas carriers at Khalifa Port.

 

Under the agreements, AD Ports Group has committed to invest up to AED 1.3 billion ($354 million) to develop the required infrastructure (primarily dredging and development of jetties), while Nimex Terminals will invest up to AED 2.6 billion ($700 million) in advanced LNG and LPG storage tanks and other superstructure construction, including regasification facilities, pipelines with instrumentation controls, loading arms, flare structures, and firefighting systems.

 

The two facilities will be developed in phases over a 5-year period with the associated investments spread over the same timeframe.

 

The Phase I of the new LPG terminal hub will see the development of two full?containment refrigerated storage tanks of 50,000 and 67,000 cu m for propane and butane respectively, together with four mounded LPG bullet tanks with an aggregate capacity of 21,000 cu m for mixed LPG products.

A similar expansion is planned under Phase 2, bringing total terminal capacity to approximately 280,000 cu m.

The project also includes the construction of dedicated LPG jetties with a 16?m depth, enabling efficient berthing and handling of large?scale LPG carriers and supporting seamless maritime trade flows, said the statement.

Phase 1 is expected to be commissioned within 36 months from the commencement of construction.

 

The LNG terminal, spanning an area of 130,000 sq m, will feature cryogenic storage facilities with a total capacity of 400,000 cubic metres. The LPG facility, occupying 90,000 m², will ultimately offer a total capacity of 280,000 cubic metres. Both terminals will serve as hubs for import, export, and transshipment operations, primarily catering to the growing demand from Asian markets. 

 

Project Structure:
The project is owned, operated and managed by AD Ports Group.