| Project Summary | |
|---|---|
| Project Name: | QatarEnergy's Bul Hanine Oilfield Redevelopment Project - Phase II |
| Facility Type: | Oil Field Development |
| Client: | Qatar Petroleum (QP) |
| Budget (US $): | 6,000,000,000 |
| Project Initiation: | Not Given |
| Project Completion:: | Not Given |
| Status: | EPC Awarded, |
| Location: | Bul Hanine |
| Project Current Status |
|---|
|
China National Offshore Oil Engineering has announced the groundbreaking of Bul Hanine project in Qatar. It involves the construction of more than 60 standalone offshore oil and gas facilities and 40 subsea pipelines and cables, as well as modification of in?service platforms and decommissioning and removal of obsolete platforms. The China National Offshore Oil Engineering is undertaking the project under an integrated EPIC scope covering engineering, procurement, fabrication, transportation, offshore installation and commissioning. The project team has established a full?cycle integrated management and control mechanism, with dedicated plans developed for key links including process interfaces, risk isolation and resource allocation. (October 2026) |
| Project History |
|---|
|
| Project Contract Awards - Feed | ||
|---|---|---|
| Contractor Prequalified | Contractor Bids Submitted | Contractor Awarded | Contract Value |
|
|
|
|
| Project Contract Awards - PMC | ||
|---|---|---|
| Contractor Prequalified | Contractor Bids Submitted | Contractor Awarded | Contract Value |
|
|
|
| Project Contract Awards - EPC | ||
|---|---|---|
| Contractor Prequalified | Contractor Bids Submitted | Contractor Awarded | Contract Value |
|
|
|
| Related Projects |
|---|
| QP’s Bul Hanine Oilfield Redevelopment Project – Phase I |
| Project Schedule |
|---|
|
2012: Project Initiation January 2025: Technical EPC Bid Submission July 2025: Commercial EPC Bid Submission August 2025: FEED awarded September 2025: Contract Awarded for EPC Package 1 and 2 November 2025: Design Contract Awarded |
| Project Scope |
|---|
|
The project scope involves redevelopment of the Bul Hanine offshore oil field, which began production in 1972, located about 120 kilometers to the east of the Qatari coastline,
The field currently has a production of about 40,000 bpd, which will be ramped up to 95,000 bpd. Enhanced oil recovery (EOR) technology is being used that will prolong the life of the field by 25 years.
The extent of work includes new offshore central production facilities and a new onshore gas liquids processing facility at Mesaieed. This will be marked by a massive drilling campaign of about 150 new wells between now and the year 2028.
New wells will be drilled from the existing/modified well-head jackets, as well as from 14 new wellhead jackets. Both new and modified wellhead jackets, in addition to associated production and injection flowlines, will form parts of the project works.
All wellheads stream fluids will be processed in the new offshore central complex, comprising of production, compression, utility and living quarter platforms, with topsides weight ranging from 4,000 to 14,000 tonnes.
Produced oil will be sent to Halul Island for export. The produced sour rich gas of about 900 million cubic feet per day will travel via a new 150-kilometre subsea pipeline to a new gas treatment facility in Mesaieed for products recovery, where lean sweet gas will be sent via a new subsea pipeline back to the new off-shore facilities for compression and injection.
The project has been divided into 3 EPC packages.
The works on the first EPC package cover - expansion of existing offshore production stations, construction of utilities platform, installation of gas-injection platform and riser platform, modifications to existing structures and installation of safety and security systems.
The EPC works on the second package cover - installation of brownfield hookups, flowlines, and associated offshore infrastructure.
The redevelopment is part of a comprehensive plan currently being implemented to raise the efficiency of producing fields as well as the implementation of various well drilling programs to increase crude oil reserves in fields like Bul Hanine and Dukhan.
QP has been receiving technical advice from French energy major Total on how to get more out of the ageing Bul Hanine field.
After the US and Russia, Qatar remains the third largest producer of natural gas in the world with 5.1% of global production. It is also the world's top exporter of liquefied natural gas (LNG) cornering 31% of total global exports in 2014, owing to its large of hydrocarbon reserves.
In 2014, in the shadow of the moratorium, Qatar's total hydrocarbon output remained unchanged at 5.2mn barrels of oil equivalent per day constituting 3.2mn from gas and 2.0mn from oil. |
| Project Structure: |
| The project is owned, operated and managed by Qatar Petroleum (QP). |
| Ahmed A.Mandani | |
|---|---|
| Address: | QP, P.O. Box 3212, Doha, State of Qatar. |
| Designation: | Projects Director .QP. |
| Phone: | .+974. 440 2633 |
| Fax: | .+974. 440 2805 |
| IssaAl Fuhaid | |
|---|---|
| Address: | Qatar Petroleum, .QP., P.O. Box 3212, Doha, State of Qatar. |
| Designation: | - |
| Department: | Planning |
| Phone: | .+974. 491390 |
| Fax: | .+974. 831257 |
| KhalidAl Hail | |
|---|---|
| Address: | Qatar Petroleum .QP., P.O. Box 3212, Doha, State of Qatar. |
| Designation: | JV Deputy Business Manager .QP. |
| Phone: | .+974. 434 3437 |
| Fax: | .+974. 434-3384 |