Project Name: Adco's Bab Integrated Facilities Expansion Project
Facility Type: Oil / Gas production
Client: Abu Dhabi Company for Onshore Oil Operations .Adco.
Budget (US $): 1,750,000,000
Project Initiation: Not Given
Project Completion:: Dec 09, 2019
Status: PMC Awarded,EPC Awarded,
Location: Bab
Project Current Status

Adnoc has awarded a $30mn contract to provide detailed engineering services for a period of three years to Bilfinger Tebodin Middle East for its onshore North East Bab project. North East Bab is part of the Bab field, which has a production capacity of almost 450,000 bpd. (November 2022)

Project History
  • The FEED study has been completed by Petrofac. (August 2014)
  • The EPC tender has been issued for the project. Technical bids are due to be submitted in December. (October 2014)
  • EPC bids submission deadline has been extended to January 2015. (November 2014)
  • Client is still finalizing technical qualification of bidders for the project. (May 2015)
  • Commercial bids are submitted for the project. (July 2015)
  • EPC tender has been cancelled after evaluation of commercial bids for the project. (December 2015)
  • Firms have been invited to submit EPC bids by 14 February, 2017 on a major project at the Bab oil and gas field. (January 2017)
  • EPC bids submission deadline has been extended to 14 April, 2017. (February 2017)
  • EPC bids have been received for the contract to expand oil production facilities at the Bab oil and gas field. The bidders for the contract are: China Petroleum Engineering & Construction Company (CPECC), JGC of Japan / National Petroleum Construction Company (NPCC) of UAE, Petrofac of UK, Saipem of Italy, SK Engineering & Construction of South Korea / Intecsa of Spain, and Tecnicas Reunidas of Spain. Deadline to submit commercial bids is 9 May, 2017. (March 2017)
  • Commercial offers have been submitted for Bab Integrated Facilities Expansion Project and the contract is likely to be awarded soon. (July 2017)
  • Adco has sought revised commercial bids, this month, for the Bab project. (August 2017)
  • Companies that are asked to submit revised bids are - China Petroleum Engineering & Construction Company (CPECC), JGC of Japan, Intecsa of Spain, Tecnicas Reunidas of Spain, National Petroleum Construction Company (NPCC) of UAE, Petrofac of UK, Saipem of Italy, and SK Engineering & Construction of South Korea. (September 2017)
  • Five firms have submitted the revised commercial bids for EPC contract on a project to expand oil production facilities at the Bab oil and gas field. (September 2017)
  • CPECC is said to have finalised terms with the client for EPC contract award. (October 2017)
  • EPC contract to upgrade Bab onshore oilfield to sustain and enhance output capacity has been awarded to China Petroleum Engineering & Construction Corporation (CPECC), affiliated to China National Petroleum (CNPC). (November 2017)
  • CPECC has awarded an integrated automation, electrification and telecom subcontract worth $79 million to ABB for the upgrade of the Bab Onshore Field in Abu Dhabi. The upgrade will include a fully integrated ABB Electrical, Control and Telecommunication (ECT) solution with 45 power and capacitor bank skids, as well as centralized and localized automation systems. ABB Ability digital oilfield technology will further enhance the ECT solution to remotely monitor and analyze field performance where multiple oil wells will be co-located in one place. Once installed, it is expected to reduce the oilfield’s operating expenditures by 10 to 15 per cent. (November 2018)
  • Ducab has been selected for supplying a complete range of cables for the Bab Integrated Facility Project. (November 2018)
  • Adnoc Onshore has invited firms to submit technical bids by 17 February, 2019 for the output sustainability works at the Bab oil and gas field. The contract scope will involve EPC works to install and modify sustainable facilities at the Bab onshore field. (January 2019)
  • The technical bids submission deadline for the output sustainability works worth $250 million has been extended deadline to 3 March, 2019. (February 2019)
  • Adnoc Onshore has received technical bids for the output sustainability works worth $250 million at the Bab oil and gas field. The bidders include: CAT of Lebanon, CCC of Lebanon/Chiyoda CCC Engineering Limited of UAE, CPECC of China, Descon of Pakistan, Dodsal of UAE, Saipem of Italy, and TechnipFMC of France. The commercial bids will be invited in 1-1.5 months time. The contract scope involves EPC works to install and modify sustainable facilities at the Bab onshore field. It covers drilling of oil production and water injection wells, including the installation of early production system (EPS) wells. (April 2019)
  • Adnoc Onshore has awarded the EPC contract to Archirodon Construction Overseas SA Co (Archirodon) to upgrade its giant Bab onshore field, one of its largest onshore producing assets, located 160 kilometers southwest of Abu Dhabi city. The investment is valued at AED1.8 billion ($489 million). Archirodon will build the facilities and infrastructure required to sustain long-term crude oil production capacity of the field at 485,000 bpd. The contract has a term of 39 months. The project scope includes the development of oil producing wells, water injection wells, artificial lift wells, well-bays, let down stations, water injection clusters and other infrastructure required to sustain the production capacity of the field. (November 2019)
  • Adnoc has awarded a contract worth $227 million (AED 834 million) to RobtStone (ME) LLC for enhanced oil recovery (EOR) of Abu Dhabi’s giant Bab field. The technology will use advanced polymers and CO2 captured from our Carbon Capture Utilization and Storage (CCUS) facility, Al Reyadah, to boost recoverable reserves up to 70% while unlocking additional barrels of Murban crude. The project marks another step towards boosting oil production capacity to 5 million barrels per day by 2030. (March 2022)
  • Adnoc has awarded the front-end engineering and design contract to Kent of Dubai for the full field development of its onshore Bab Far North project. The contract scope involves 22 new oil producers and 32 WAG (water and gas) injectors, along with multiple pads. A carbon dioxide recovery plant and injection facilities, oil, water and CO2 injection networks and other associated surface facilities are also envisaged. (September 2022)
Project Contract Awards - Feed
Contractor Prequalified Contractor Bids Submitted Contractor Awarded | Contract Value
Project Contract Awards - PMC
Contractor Prequalified Contractor Bids Submitted Contractor Awarded | Contract Value
  • No Tendering Process
  • No Tendering Process
Project Contract Awards - EPC
Contractor Prequalified Contractor Bids Submitted Contractor Awarded | Contract Value
  • China Petrochemical Engineering Construction Company
  • National Petroleum Construction Company of UAE
  • South Korea's GS Engineering & Construction Corp
  • Hyundai Engineering & Construction Co Ltd.
  • Tecnicas Reunidas
  • JGC Corporation of Japan
  • Petrofac
  • Saipem
  • Samsung Engineering
  • SK Engineering Company .SKEC.
  • Intecsa
  • China Petrochemical Engineering Construction Company
  • JGC Corporation of Japan
  • Petrofac
  • Saipem
  • SK Engineering Company .SKEC.
  • Tecnicas Reunidas
  • China Petrochemical Engineering Construction Company($1.5 billion)
Related Projects
No Related Projects
Project Schedule

October 2014: Invitation to Bid for EPC

July 2015: Bids Submission EPC

December 2015: EPC Tender Cancelled

January 2017: Invitation to bid for revised EPC tender

March 2017: Bids submitted for revised EPC tender

July 2017: Commercial bids submitted for revised EPC tender

September 2017: ITB for revised commercial offers

September 2017: Revised commercial bids submitted

November 2017: Contract Awarded EPC

April 2019: EPC technical bids submitted for Integrated Facilities Expansion

2019: Expected start-up and commissionin

Project Scope

The project scope involves the expansion of the Bab Integrated Facilities to develop the emirate's Bab field, located southwest of Abu Dhabi. 

 

The project will raise Adco's overall oil production from 1.4 million bpd to 1.8 million bpd.

 

Surface facilities will be delivered for the Thamama-A, Thamama-H and Thamama-B production zones to achieve a total sustainable oil production rate of 450 million bpd.

 

The integrated facilities expansion will include a new well fluid gathering system comprising off-plot wells, well bays, flowlines, manifolds and other associated hardware and equipment.

 

It also includes an additional processing train with a 176,000-barrel-per-day total liquids capacity in the existing Bab Central Degassing Station (BCDS) with associated facilities.

 

In addition, the successful contractor will also be responsible for the modifications to the existing BCDS facilities.

 

Bab Far North is part of the Bab field, which has a production capacity of almost 450,000 bpd. The project marks another step towards boosting oil production capacity to 5 million bpd by 2030, up from the existing 4 million bpd capacity.

Project Structure:
The project client is Abu Dhabi Company for Onshore Oil Operations (Adco). Adco is majority-owned by Adnoc, which has a 60% stake in the state-owned onshore giant. BP and France’s Total each hold a 10% interest. Japan’s Inpex has a 5% interest in Adco and South Korea’s GS Energy has 3%. In addition, the remaining 12% stake in Adco was recently taken up by two Chinese companies. China’s state-controlled China National Petroleum Corporation was awarded an 8% stake by Adco, while the remaining 4 % was taken by CEFC China Energy.
AbdulM Al Kindi
Address: Abu Dhabi Company for Onshore Oil Operations .Adco., Abu Dhabi, United Arab Emirates
Designation: General Manager
Department: ADCO - Projects
Phone: +971 2 604 3622
Fax: +971 2 666 6360
Abu Dhabi Company for Onshore Oil Operations UAE
Address:

P.O. Box 270, Abu Dhabi,

United Arab Emirates

Phone: +9712-6040000
Fax: +9712-6665523
AhmedAl Hammadi
Address: Abu Dhabi Company for Onshore Oil Operations .Adco., Abu Dhabi, United Arab Emirates
Designation: Business Manager
Department: ADCO - Project Field Services
Phone: +971 2 604 4900
Fax: +971 2 604 4759
ArefAl Sayed
Address: P.O. Box 270 Abu Dhabi, U.A.E.
Designation: Procurement Manager
Department: ADCO
Phone: +97126043715
Fax: +97126650848