Bid & Tender

News

SEC Invite Bids for Longest 380kV OHTL

Saudi Electricity Company invites bid for the construction of 380kV Double Circuit Overhead Transmission Line (OHTL) between Hail and Al Jouf.

 

The project involves the design and construction of one (1) 380kV OHTL to connecting the Hail 3 BSP 9039 and Al Jouf 1 BSP. Approximate route length of total OHTL route is 374.95 km.

 

The project involves using of 4-795 kcmil ACSR/AW CONDOR conductor per phase and two (2) OPGW along the length of the new line.

 

The new OHTL will be installed on latticed steel tower in vertical configuration.

 

The Contractor shall perform on Lump sum turnkey basis, the design, engineering, materials procurement, quality management, factory inspection/testing, transport and delivery to site, installation, construction, site inspection, testing and commissioning, all associated work and services until final handing over of new OHTL work in a satisfactorily working and operating condition.

 

Contractor need to complete the project activities within 24 months from the date of contract award.

BACK

Related News