Bid & Tender

News

Isgec Heavy Engineering Wins Order for Multi-Feed Distillery

Isgec Heavy Engineering has received an order for 175 klpd multi-feed distillery from Dwarikesh Sugar Industries for their site at Bareilly in Uttar Pradesh.   

 

The multi-feed distillery is based on sugarcane syrup, b-heavy molasses and final molasses to produce absolute alcohol (ethanol) for blending with petrol (EBP). 

 

The project also includes 40 TPH slop-fired incineration boiler and five MW power plant with extraction/condensing type turbine and balance of plant on turnkey basis.

 

This is a complete turnkey project with technologies like fed-batch fermentation, multi- pressure distillation for rectified spirit, dehydration based on Molecular Sieve Dehydration (MSDH), multiple effect evaporation for raw spent wash, slop-fired incineration boiler with support fuels like bagasse, rice husk and coal with extraction and condensing-type turbine. 

 

This distillery is designed on the complete Zero Liquid Discharge (ZLD) concept. It is a repeat order from Dwarikesh Sugar Industries after the successful execution of a distillery project of 109 klpd capacity for their Bundki unit.

BACK

Related News